3931 A design engineer hired by a subcontractor to draw plans for a retaining wall the subcontractor was hired by a contractor to build owes no duty to draw the plans in a reasonable manner to the owner of the property who hired the contractor.CitationWESELOH v WESSEL (Retaining Wall) 125 CA4 152[See: Biakanja v Irving 49 C2 647; Bily v Arthur Young 3 C4 370, T/AT 11/92; BFGC v Forcum/Mackey 119 CA4 848, T/AT 7/04] |
|
|
|||||
|
|||||